2023 Rate Schedule

Miscellaneous
  • Pole Contacts:
    • Pole Attachment Charges: $9.72 per pole per year
Lighting Service

New Installation at full cost of labor, materials & fixture to member. Please ask for estimate.

  • Street Lighting: 175 Watt Lamp @ $10.45 per month
  • Security Lighting: Existing Pole @ $8.15 per month
Irrigation
  • Annual Charge:
    • First 30 HP @ $11 per HP
    • Next 31-50 HP @ $9 per HP - Plus $330 for 1st 30 HP
    • Over 50 HP @ $7 per HP - Plus $510 for 1st 50 HP
    • Minimum Charge – Single Phase - $110.00; Three Phase - $135.00
  • Demand Charge: @ $6.28
  • Horsepower Charge: @ $4.64 per HP
  • Energy Charge: All kWh’s @ $.0513 per kWh
Large Commercial – Over 50 KW
  • Basic minimum charge per meter, per month:
    • Single phase - $37
    • Three phase - $42
  • Demand Charge:
    • All kW @ $5.64 per kW
  • Energy charge:
    • All kWh’s @ $.0808 per kWh
Residential
  • Basic minimum charge per meter, per month:
    • Single phase - $37
    • Three phase - $42
  • Energy Charges:
    • All kWh’s @ $.0986 per kWh